        I. Foreword: This manual mainly instructs you on how to use the equipment properly. Its purpose is to prolong the service life and diminish operational failure, so as to guarantee the compressed air quality. It also gives relevant information on the equipment for reference. So please read the manual carefully before use, and take operation and maintenance according to the instructions for fear of equipment breakdown. II. Functions:        The key function of the cooling-type compressed air freeze dryer is to remove the moisture of compressed air. With a cold media heat exchanger (evaporator), it can drop the compressed air temperature to 10℃ and condense the moisture or water drops in the compressed air. Then it separates the air from water drops with a separator. Then the water drops are discharged from the system by an automatic drainer, which puts the pre-cooling process. Under normal situation, the water content of the precooled compressed air is about 0.59g/m3, and the dewatering rate is up to 93%. The user can select the right model or add filters according to the actual condition. III. High Efficiency from the Excellent Jiasheng Design: The low energy consumption and low pressure drops enable the lowest operating cost, so it is energy-efficient. The large ‘Gas-to-Gas’ heat exchanger can remove half of the heat load in the air, thus to narrow the cooling system and reduce the power consumption to the utmost, which guarantees sufficient cooling and frees the downstream pipeline from condensation; With large covering, the evaporator enables to cool down the compressed air evenly to dew point temperature. The multi-channel design of the coolant can make the best use of the available cooling capacity and free the evaporator from frost. IV. Cold Media System Flow:        Compressed by the cold-media compressor, the cold media will turn into high-pressure and high-temperature gas. After radiated by the air-cooling condenser, it will be condensed to liquefaction. And then the moisture and impurity are removed from its pipeline with a dry filter. And then the high-pressure liquid cold media will go through the capillary throttle before turning into low-pressure and low-temperature liquid to enter the evaporator. Then it absorbs the heat from the compressed air, and is gasified into the low-temperature gaseous cold media, and flows back to the compressor through the liquid-gas separator, which puts the refrigeration cycle to an end. V. Installation Instructions: Location 5.1 Choose a cool and draughty place as the best location for installation. 5.2 Installation of the machines the ambient temperature is limited to 35℃ 5.3 Do not install it outdoors, in a damp and dusty place, or in a corrosive and polluted place.   5.4 The location shall be one meter away from the wall and two meters away from other machines, which facilitates cleaning and maintenance.   5.5 Install it horizontally to facilitate drainage.   Wiring 5.6  Install a dedicated switch beside the power supply of the dryer for protection. For more information please refer to relevant instruction manuals.  5.7  The supply voltage cannot exceed the rated voltage.(Label specification±5%) 5.8  The power cord’s specifications depend on the current and the length of wires.  5.9  Do not share the protection switch with any other equipment.   5.10 Connect the ground wire properly.  III. Operations: 6.1 Verify that the power supply is under normal voltage (label specification±5%). 6.2 Verify that the environmental temperature is normal. 6.3 Verify that the compressed air has not yet entered the dryer. (Stop the air compressor from running, or fasten the valves, and turn on the air bypass valve.) 6.4 Verify that the cold media meter is under normal pressure. (Before running, the cold media pressure must be kept around 7~11kgf/cm2,and not less than 6.0kgf/cm2 in winters). 6.5 Verify that the cooling water intake is under normal pressure and humidity. (Hydraulic pressure: 2~4kgf/cm2, water temperature: max. 35°C)  6.6 Verify that the exhaust rate of the air compressor matches the processing capacity of the freeze dryer.     During Operation 6.7 Turn on the power, and the dryer will begin to work.  6.8 Verify that the dryer is under normal working voltage.(See label.) 6.9 Verify that the cooling water intake/outtake is under normal temperature difference.(5~10°C) 6.10 Verify that the cooler’s fan motor is running well.   6.11 After ten minutes of running, let the compressed air in the dryer.(Start up the air compressor or open the valves slowly and close the air bypass valve.)  6.12 Check whether there is air leakage.   6.13 Verify that the intake compressed air temperature is normal.(High temperature: WCD≤80°C,Low temperature: WAD≤40°C)  6.14 Verify that the intake compressed air is under normal pressure.(See label.) 6.15 Verify that the passageway of the dryer is under normal temperature difference.(Temperature difference:10~30°C)。 6.16 Verify that the cold media is under normal high/low pressure. (High pressure under zero load:13.5~15.5kgf/cm2, Low pressure:3.6~4.0kgf/cm2)。 6.17 If the water-cooling model is under abnormal high pressure, please adjust the water-regulating valve at the cooling water entrance. (Clockwise to decrease the pressure, and vice versa.)  6.18 After 30 minutes of operation, check whether the drainage system is under control.(Generally speaking, the high-pressure drainer will drain automatically.) When all the above items are normal, the operation is under control. 

Caution:

1、Idling should be not more than 30 minutes.   2、Restart the machine 5 minutes after shutdown for fear of damaging the compressor.   IV. Routine Maintenance: 7.1 Check the high-pressure drainer every day for fear that it might be jammed to stop draining;clean it once it is jammed;clean it once a week(depending on the actual situation). 7.2 Check whether the cooling water is under normal condition every day (Standard hydraulic pressure: 2—4kgf/cm2,intake water temperature: below 35°C. 7.3 For the water-cooling model,please clean the water filter every three months or when the high pressure of the cold media is over 17kgf/cm2. If the pressure of the cold media is still off standard, please clean the condenser and the front cooler.   7.4 Open the drainage valve at least twice a day.   7.5 For large models, please coordinate with our company on a thorough maintenance. VI.  Multiple Protection System:           Overcurrent protection;Compressor overheat protection. The multiple protection system ensures normal operation of the equipment and rest you assured.       IX. Failure and Solutions:
State Cause Solutions
Abnormal power supply   Master power supply protection switch damaged or jumped off Make sure whether the power supply is lack of phase, in short circuit or unconnected to ground wire, and check whether the power switch is damaged. 
Abnormal voltage Rated voltage allowance on label ±5%
Offline  Find and repair the offline part  
Electric organ breakdown  Bad power switch, electromagnetic switch or fuse  Replace it.
Overload protector, high-pressure protection switch jumped off or in bad condition  Reset or replace it.
Poor operating capacitance Replace it.
Bad compressor Replace it.
Bad pressure switch  Replace it.
Bad fan motor Replace it.
Bad overload protector Replace it.
Poor capacitance of blower Replace it.
Service condition not matched or wrong operation  Continuous startup Restart at an interval of over 5 minutes.
Overload throughput  Precooler overload
Precooler’s inlet temperature or environmental temperature too high  Add cooling or improve ventilation.  
Fin of condenser or cooler jammed  Cleanse it.
     
State Cause Solutions
Abnormal piping system Piping valve not fully open  Open the valve fully.
Small caliber Enlarge the caliber.
Too long piping, too many elbows and joints Redesign the piping system.
Over two air compressors in parallel operation, not matched well Redesign the piping system
Bypass valve not fastened  Fasten the bypass valve.
Air not past dryer Fully open the intake valve of the precooler.  
Precooler not horizontal Put it horizontally.
Air handling capacity exceeds rated value.  Piping filter jammed Cleanse the filter or replace the filter element.  
Too much air leakage on piping joint   Check the piping. 
Evaporator’s end plate frozen Bad pressure switch Replace it, check the circuit, and revise the switch.
Capillary jammed Check or replace the capillary.  
Abnormal cooling system Cold media leakage Fill the leakage or fill cold media.
Compressor valve wear and tear Replace it. 
Cold media piping jammed Change the desiccant,vacuumize it again, and fill the cold media. 
Pressure switch failure  Replace it.
Breakdown of fan motor of condenser or cooler  Replace it.
Abnormal dewatering effect  Condenser fin jammed  Cleanse it. 
Drainage valve failure or not fully open Replace it or open the valve.
Abnormal operating pressure  Consider to change or update the model.
Automatic drainer inclined  Put it horizontally.
Drainer filter screen jammed Cleanse it.
Drainpipe jammed Cleanse it.
Drainpipe higher than automatic drainer Reinstall the drainpipe. 
Drainage floating ball trouble Replace it.
        X. Working Condition:
Specification Sheet:
Model   WCD- 5SG WCD-10SG WCD-20SG WCD-30SG WCD-50GF WCD-60GF WCD-75GF WCD- 100GF WCD- 120GF
Air throughput Nm3/min 0.85 1.5 2.5 3.5 6.5 6.5 8.5 13.5 13.8
Power supply(A) 1Φ 220V  50HZ   1Φ 220V  50HZ 1Φ 220V  50HZ 1Φ 220V 50HZ 1Φ 220V  50HZ 1Φ 220V 50HZ 1Φ 220V  50HZ 1Φ 220V     50HZ 1Φ 220V     50HZ
Compressor power(kw) 0.2 0.43 0.73 0.92 1.38 1.38 1.78 2.57 2.57
Working current(A) 1.5 2.9 3.6 4.0 6.8 6.8 8.6 10 10
Cold media filling capacity(g) 250 650 700 950 1100 1200 1400 1800 1800
Air passageway caliber R3/4 R1 R1 R1-1/2 R1-1/2 R1-1/2 R2 R2-1/2 R2-1/2
Net weight 23.5 KG 94.5 KG 99  KG 103 KG 123 KG 170 KG 210 KG 238KG 350KG
Place type size(mm) 530 350  450 730  380  910 730  380  910 740  430  940 900  500 1290 1020  610  990 1010  610 1290 1200   620   1200 1260   610   1350
  •Cold media:口R22 口R407 口R410   •Working pressure:Standard: 0.7Mpa,Max:1.0Mpa    •Allowable inlet temperature:≤80°C。   •Environmental temperature:below 35°C    •Dew point temperature:2—10°C。   •Installation environment:draughty and dust-free place    •Extra specifications available upon demand 
點擊次數:  更新時間:2014-01-14  【打印此頁】  【關閉
上一條:沒有了  下一條:沒有了
再線交談 
【廣告電話勿擾!】
設備咨詢:
劉經理13661495136
微信咨詢:3962913
QQ:
郵箱:tfsye@vip.163.com
電話:021-51083925
全國咨詢熱線:
400-888-3058
狠狠色成人一区二区三区_久久国产精品波多野结衣AV_一区二区三区欧美_亚洲深夜福利视频 狠狠色成人一区二区三区_久久国产精品波多野结衣AV_一区二区三区欧美_日韩操比视频 狠狠色成人一区二区三区_久久国产精品波多野结衣AV_一区二区三区欧美_亚洲欧美性另类春色 狠狠色成人一区二区三区_久久国产精品波多野结衣AV_一区二区三区欧美_久久精品女人18国产毛片蜜桃 狠狠色成人一区二区三区_久久国产精品波多野结衣AV_一区二区三区欧美_欧美性大战XXXXX久久久

m.nzcxsc.cn

m.aoojob.cn

m.yalysh.cn

m.khqf.com.cn

m.kkaba.cn